Enquiry for Renocell
Verification Code:
Company Name :
Address :
Country :
Telephone :
Fax :
E-Mail :
Contact Person :
Please have your local PAL representative contact me.
The data gathered by this form is sought to establish the sizing parameters for electrolytic recovery of metals by the renocell. We are seeking to find the water volumes and concentrations of metals and anions that will enable us to make an accurate sizing and a competitive offer.
Please provide preliminary quotation based on the following information.
1.
What is the description or name of the production process e.g. Black oxide.
Panel Plating
Pattern Plating
PTH
Black Oxide
Alkaline Etching
Acid Etching
Ni/Au Plating
Others :
2.
What is the area output of the machine e.g. 200 No. 18X24 pph.
ft²/month
m²/month
3.
What Metal is the Renocell required to recover and what source solution formulation e.g. copper in microetch H
2
SO
4
/H
2
O
2
Mcdermid G5.
Cu
Ni
Au
Ag
Sn
Pd
Others :
H
2
SO
4
HCl
Others :
4.
What stage is the source of water fed to the Renocell e.g. first rinse after process.
5.
What are the average concentrations of the metal to be recovered in the process bath and or the reclaim water stream fed to the Renocell e.g. copper 32 g/l in micro etch and 0.35 g/l in the rinse.
6.
What water flowrate is feeding the renocell system and what is the primary source of the water and approximate analysis if from the city supply e.g. 500 litres per hour rinse is fed with city supply 500ppm TDS 150 ppm Ca.
7.
If you are still unclear please give a typical sample or estimate a flow and metal concentration. We can often approximate the working conditions from other examples in our experience.
8.
What final metal concentration is required at discharge from the Renocell.
9.
What is the intended use of the recovered metal e.g. smelt.
10.
What support equipment is required e.g. rectifier, tanks, pumps, controls (if all write all).
11.
What Electrical supply is available (volts/hz/3 ph/3/4/5 wires).
12.
What Water supplies and pressures are available.
13.
What other services are available e.g. comp. air/steam/chemicals.
14.
What other water or waste processing equipment is in the loop with the Renocell.
15.
What is the position and connections (sizes and levels relative to the ground) of the process line and the Renocell and its support module.
16.
Others.